First, the operator must be familiar with the welding principle of thewire mesh welding linemachine, the use of each control button, and then achieve the following two points:
1. Be sure to read the product manual carefully.
2. In the process of using the machine after installation and debugging, it is necessary to carefully check whether each part of the machine is in good condition.
Operation flow of wire mesh welding line machine
1. Before use, make sure that the plug of control board must be plugged and fastened;
2. The outer shell of thewire mesh welding line machine must be reliably grounded, and the welding machine shall not be affected by moisture;
3. Adjust the secondary voltage according to the thickness of welding parts, and the indicator light should be on when the power switch is turned on;
4. Step on the pedal, the contactor is absorbed, and control welding time, that is, the welding process can be completed, and spot welding and multi-point simultaneous welding can be completed;
5. Do not touch the contact with your hand to avoid electric shock and shock.
6. After each operation, the photoelectric machine head should be repaired in time;
7. After each work, check whether the machine head, spring, lever group and foot are damaged and loose, and restore and repair in time;
8. Check the electrical control components after the completion of each work order to see if they are effective. If there is any damage, replace and repair it in time;
9. Repair mechanical transmission parts on the day of damage. Communicate with manufacturers to repair as soon as possible
10. When using power, it is not allowed to open the control box housing, let alone touch all parts of the box by hand to avoid electric shock (high pressure of 380V inside the box).
11. Make sure to cut off the power supply when checking internal connection and control board connection.
12. Do not touch the components on the control board by hand, or there may be static electricity damage to the components.
13. The potentiometers on the control board have been adjusted. Please do not move.
14. The control box should be connected with cooling water before use, and sufficient flow and pressure of cooling water should be ensured. The water cooling system should be checked regularly (once a month). The running water should be kept clear and watertight.
15. Check the wiring in the box regularly (once a month).
March 14, 20191. The working surface of the feeding material should be kept at the lower part of the cutter, and the length of the worktable can be determined according to the length of the processing material.view
November 29, 2021The application of steel bar bending machine is very extensive. It can be said that it is often used especially in the field of steel and construction. It has a lot of performance, good bending effect...view
July 9, 2019We know how important the quality of the wire mesh is in the wire mesh welding line machine performance configuration, and brand price is next, and use value is the key. So how do you see the configur...view
June 15, 2021Steel bar is one of the most frequently used auxiliary materials in the construction industry. In construction engineering, steel bars will inevitably be straightened, bent and cut off. At this time, ...view
August 5, 2019Wire straightener is widely used in constructional engineering, it is loved by many people because it can improve processing speed. However, many customers said that there is some abnormal sound in th...view
November 27, 20181. The section which from 200mm to 250mm is checked on the metal wire and the surface of the wire must not be damaged when straightening.2. There are four vertical holes on the main pulling rod. The h...view