Installation And Connection of Reinforcing Cage Welding Machine
Reinforcing cage welding machine uses 100t crane platform to hoisting. Because the size and weight of the cage are quite large, the deformation of hoisting and shifting must be taken into account when making the cage. In order to protect the steel cage from deformation, two-point hoisting should be adopted. The first lifting point is located in the lower part of the skeleton, and the second lifting point is located between the midpoint of the skeleton length and the upper third point. When lifting, the first lifting point is raised first to lift the skeleton, and then the second lifting point is hoisted at the same time. With the second lifting point is raising, the first lifting point is gradually relaxed until the skeleton is perpendicular to the platform, and the first lifting point is then released.
When hoisting the reinforcing cage into the hole, it should be aligned at the hole, put into the hole slowly. After the reinforcing cage enters the hole, it should be carried down slowly. In case of the resistance, it should stop devolving, identify the cause and deal with it before continuing. It is strictly prohibited to rise and fall, bump and force down.
When the reinforcing cage in the upper section is lowered to the top of the platform, which is about 1.5 m above the top of the platform, use 4 20t gourd to fix the reinforcement on the frame, then hang the next section of reinforcement to the top of the hole, so that main reinforcement of the upper and the lower two reinforcing cages align, and ensure that the upper and lower axes are consistent (fine-tuned with the gourd), at the same time, use the alignment of the upper and lower sections of the reinforcing, weld the sound measuring pipe and make straight line connection, after all the joints are connected, wind the screw bars, hoist up the reinforcing cage, take off the 4 hand pull gourds, then descend into the hole slowly and uniformly, at the same time shun upper protective layer block of the reinforcement.
Spreading of acoustic tube adopts thread connection mode, the spreading of the pipe should be kept water free, at the same time, the pipe end of the acoustic tube should be covered with 6 m thick plate, so as to prevent the reinforcing cage in the acoustic measuring pipe, such as sand, garbage, etc., from entering into the hole, and according to the design requirements to check the elevation, burying parts, etc. It should make a good record. After meeting the requirements, connect 8 main tendons to the upper end of the cage and extend them to the orifice, prevent the reinforcing cage from being lifted when its weight falls or the concrete is injected into the pile, the concrete of the pile body is poured out.
October 7, 2018Rebar bending machine is one of the most commonly used construction machinery in the construction industry. It mainly processes rebar into various shapes to meet the needs of production. With the deve...view
September 2, 2017"Chinese concept" is not only about China, but also provides the Chinese method to solve the problem of the universe peace deficit, the development of the deficit, governance deficit.view
June 21, 2019Manufacture of wire cages 1. Material Requirements: rebar must have the certificate of qualified exit and quality assurance certificate. Rebar should be stacked separately according to specifications,...view
February 8, 2021The wire drawing process is a new type of surface treatment process, which mainly uses aluminum products and aluminum plate as the base material. The wire drawing wheel, wire drawing abrasive belt or ...view
April 7, 2022Steel bar cutting machines are designed to cut all types of round bars and fixed length bars. It is a typical steel bar cutting machine. There are generally two types of steel bar cutting machines on ...view
August 4, 2018After using the wire straightener, the machine's step and work surface should be cleaned up, which is beneficial to the next using process of the wire straightener.view